In Szczecin, we are renovating more than 6.2 km of combined sewer and sanitary network built in the 1920s-1930s and 160 wells.
Modernized concrete circular pipes (DN250–600), non-circular (500 x 750mm to 600 x 900 mm), as well as sandstone pipes (DN250–500mm).
The main renovation we carry out is CIPP. We carry out work simultaneously in eight districts of the city.
The contract worth more than PLN 11 million was signed in December 2018 and is the second stage of the project called “Czysta Odra w Szczecinie”.
The work is due to be completed in October 2020.
Date: 2018-2020
Investor: Zakład Wodociągów i Kanalizacji Sp. z o.o. w Szczecinie Technology: CIPP